3 reasons to get a charging station from Vaasan Sähkö 

Ease of use

The charging station is easy to control with an app. Companies can also choose their billing method, and the costs can be directed to the user, if desired.

Safety

The equipment includes, as standard, a built-in residual current device. In addition, dynamic load management ensures that the electricity connection cannot be overloaded under any circumstances.

Pricing options

The company can choose the best pricing option. Amongst other factors, pricing can be based on an hourly usage fee or the company’s own electricity contract, or it can be charged directly based on the price of exchange electricity. 

charging station is smart and easy to use

Dynamic load management enables the smart charging of electric vehicles so that the electricity connection is not overloaded under any circumstances. It helps to utilize the company’s current electricity connection to the fullest, which usually eliminates the need to increase the capacity of the property’s electricity connection. This will reduce the company’s costs in relation to charging solutions.  

For added ease of use, there is no need to set the current limits manually. Instead, an automated system ensures that the connection is not overloaded. 

Diverse pricing options

The company can choose the best pricing option. Amongst other factors, pricing can be based on an hourly usage fee or the company’s own electricity contract, or it can be charged directly based on the price of exchange electricity. 

The payment is debited from the user’s payment card and directed to the account specified by the company. This way, everything is done automatically without the need for meter reading or manual billing. 

Obligation to install electric vehicle charging stations

Did you know that the law may oblige your company to install electric vehicle charging stations? Check whether the obligation applies to your company. 

Request a quote for a charging station

"*" indicates required fields

Has a survey for charging infrastructure already been conducted on the property?